TECHNIQUE OF HYDRO-SLOTTING PERFORATION 

HSP TECHNOLOGICAL PARAMETERS

SURFACE EQUIPMENT FOR HSP PROCESS

   Rig with crew (Workover)

   Surface piping

   Low pressure line

   Wellhead with BOP

   Tubing

   Water tank

   Cutting tank with vibrator

   Frack-pump service with crew

   Frack-van (monitoring center)

   Blender (mixer)

   High pressure line

   Manifold unit

   Formation water

   Abrasive filler

STAGES OF HSP PROCESS

   Lowering HSP tool to the predetermined depth

●   Logging - correlation

●   Correction of first cutting interval (position)

●   Surface equipment test

●   Tubing pressure test (optional)

●   Reverse flushing (if tubing test)

●   Cutting first interval

●   Direct flushing

   Lifting HSP tool for next cutting interval

●   Cutting second interval

●   Direct flushing

●   Lifting HSP tool for next cutting interval

●   Cutting third interval

●   Direct flushing

●   Process is repeated until the last cutting interval

●   Direct flushing

●   Lifting HSP tool to the surface

SURFACE EQUIPMENT FOR HSP PROCESS

Maxxwell Production
Maxxwell Production
Maxxwell Production
Maxxwell Production
Maxxwell Production
Maxxwell Production
Maxxwell Production
Maxxwell Production
Maxxwell Production
Maxxwell Production
Maxxwell Production
Maxxwell Production
Maxxwell Production
Maxxwell Production
Maxxwell Production
Maxxwell Production